From the above explanation, it can be concluded that the market share of Four Seasons Resort, Jimbaran, Bali is among the upper class, highly prioritizes quality of care. In this resort the Engineering Department which is responsible for implementing maintenance management systems of all assets (equipment). Based on the above brief description, of the facilities offered by the resort, can not be denied that the work load (work load) maintenance of an inventory of the resort is very heavy. Maintenance of existing surveillance systems in the engineering department still manual. Each request repairs (maintenance) still use manual spreadsheets.

Four Seasons Resort is also faced with a lot of transactions performed each day, and the management of existing data is still done manually, so it takes a long time in processing transactions and reporting. In order to improve its performance in providing maximum service and optimize the performance of this resort, in this final step is to design scheduling and management information systems division of maintenance tasks by using the method of timetabling with resource constraints .. It is a system that can assist parties in implementing the tasks resorts scheduling and task distribution pereawatan. In the system, the engineering department as a user only menginputkan all information required and so the system will set the schedule and the distribution of maintenance tasks. So, from the making of this final data processing and reporting has not been computerized, but the manual again.

In fact, activity scheduling and task distribution transactions not only exist within the engineering department alone therefore for further development of timetabling methods with resource constraints should not only be used in the engineering department alone, but in other departments do not even cover the possible in-company Other large companies. " xml:lang="en_US" />
Image01
RANCANG BANGUN SISTEM INFORMASI MANAJEMEN PENJADUALAN DAN PEMBAGIAN TUGAS PERAWATAN DI FOUR SEASON RESORT JIMBARAN -BALI
DESIGN AND IMPLEMENTATION OF MANAGEMENT INFORMATION SYSTEM MAINTENANCE SCHEDULLING AND DUTY DISTRIBUTION IN FOUR SEASON RESORT JIMBARAN - BALI
Undergraduate Theses dari STIKOM Surabaya / 31-08-2010 16:31:25 WIB
Posting oleh prastyo  •  Ditampilkan sebanyak 70898 kali

Share this information : Share

Author : YEHAZIEL SILVANUS ELNATAN OSIYO (98410104117)


Subject:HOTELS - MAINTENANCE & REPAIRS
MANAGEMENT INFORMATION SYSTEM
Keyword:SISTEM INFORMASI MANAJEMEN PENJADUALAN
RANCANG BANGUN

Abstract in Bahasa Indonesia

Four Season Resort Jimbaran–Bali, merupakan bagian dari jaringan hotel internasional “Four Season”, dan termasuk hotel yang menduduki peringkat pertama seAsia dan peringkat kelima dunia versi majalah “Conde Nast Traveller”.

Dari penjelasan di atas, dapat disimpulkan bahwa pangsa pasar dari Four Season Resort Jimbaran–Bali adalah kalangan kelas atas, yang sangat mengutamakan mutu pelayanan. Dalam resort ini Departemen Engineering yang bertanggung jawab dalam melaksanakan sistem manajemen perawatan terhadap seluruh aset (peralatan). Berdasarkan pada penjelasan singkat di atas, terhadap fasilitas-fasilitas yang ditawarkan resort ini, tak dapat dipungkiri bahwa beban kerja (work load) perawatan terhadap inventaris resort sangatlah berat. Sistem pengawasan perawatan yang ada di departemen Engineering masih bersifat manual. Setiap permintaan perbaikan (perawatan) masih menggunakan lembar kerja manual.

Four Season Resort juga dihadapkan pada banyak transaksi yang dilakukan setiap hari, dan pengelolaan data-data yang ada masih dilakukan secara manual, sehingga memerlukan waktu yang lama dalam proses transaksi maupun pelaporannya. Agar dapat meningkatkan kinerjanya dalam memberikan pelayanan secara maksimal dan mengoptimalkan kinerja resort ini, dalam tugas akhir ini dilakukan perancangan sistem informasi manajemen penjadualan dan pembagian tugas perawatan dengan menggunakan metode timetabling with resource constraint.. Yaitu suatu sistem yang dapat membantu pihak resort dalam melaksanakan tugas penjadualan dan pembagian tugas pereawatan. Dalam sistem, departemen engineering sebagai pengguna hanya menginputkan segala informasi yang dibutuhkan dan seterusnya sistem yang akan mengatur jadual dan pembagian tugas perawatan. Sehingga dari pembuatan tugas akhir ini proses pengolahan data-data dan pelaporannya sudah tidak manual lagi melainkan sudah terkomputerisasi.

Dalam kenyataannya aktifitas Transaksi penjadualan dan pembagian tugas tidak hanya ada didalam departemen engineering saja oleh karena itu untuk pengembangan lebih lanjut metode timetabling with resource constraint ini sebaiknya tidak hanya digunakan pada departemen engineering saja, melainkan di departemen-departemen lainnya bahkan tidak menutup kemungkinan di perusahaan-perusahaan besar lainnya.


Abstract

Four Seasons Resort, Jimbaran, Bali, are part of an international hotel chain "Four Seasons", and includes hotel seAsia ranked first and the fifth world version of the magazine "Conde Nast Traveller."

From the above explanation, it can be concluded that the market share of Four Seasons Resort, Jimbaran, Bali is among the upper class, highly prioritizes quality of care. In this resort the Engineering Department which is responsible for implementing maintenance management systems of all assets (equipment). Based on the above brief description, of the facilities offered by the resort, can not be denied that the work load (work load) maintenance of an inventory of the resort is very heavy. Maintenance of existing surveillance systems in the engineering department still manual. Each request repairs (maintenance) still use manual spreadsheets.

Four Seasons Resort is also faced with a lot of transactions performed each day, and the management of existing data is still done manually, so it takes a long time in processing transactions and reporting. In order to improve its performance in providing maximum service and optimize the performance of this resort, in this final step is to design scheduling and management information systems division of maintenance tasks by using the method of timetabling with resource constraints .. It is a system that can assist parties in implementing the tasks resorts scheduling and task distribution pereawatan. In the system, the engineering department as a user only menginputkan all information required and so the system will set the schedule and the distribution of maintenance tasks. So, from the making of this final data processing and reporting has not been computerized, but the manual again.

In fact, activity scheduling and task distribution transactions not only exist within the engineering department alone therefore for further development of timetabling methods with resource constraints should not only be used in the engineering department alone, but in other departments do not even cover the possible in-company Other large companies.

Contributor:JANUAR WIBOWO, ST., MM
ROMEO, ST
Date Create:31-08-2010
Type:Text
Format:pdf
Language:Indonesian
Identifier:STIKOM Surabaya-Undergraduate-4-19833
Collection ID:4-19833
Call Number:PERPUSTAKAAN STIKOM 647.940 288 ELN R


Coverage :
Terbatas Sivitas Akademika STIKOM Surabaya

Rights :
Hak Cipta (c) 2009 oleh STIKOM SURABAYA. Dilarang mengcopy atau mendistribusikan baik sebagian atau seluruh isi koleksi ini dalam bentuk apapun, baik secara elektronis maupun mekanis tanpa izin dari penulis.

Download koleksi - Terbatas untuk Member

1. STIKOM Surabaya-Undergraduate-1008-Cover.pdf - 186 KB pdf files

2. STIKOM Surabaya-Undergraduate-1008-Abstraksi.pdf - 161 KB pdf files

3. STIKOM Surabaya-Undergraduate-1008-Daftar Isi.pdf - 117 KB pdf files

4. STIKOM Surabaya-Undergraduate-1008-BAB I.pdf - 364 KB pdf files

5. STIKOM Surabaya-Undergraduate-1008-BAB II.pdf - 758 KB pdf files

6. STIKOM Surabaya-Undergraduate-1008-BAB III.pdf - 2913 KB pdf files

7. STIKOM Surabaya-Undergraduate-1008-BAB IV.pdf - 2834 KB pdf files

8. STIKOM Surabaya-Undergraduate-1008-BAB V.pdf - 110 KB pdf files

9. STIKOM Surabaya-Undergraduate-1008-Daftar Pustaka.pdf - 60 KB pdf files



 10 dokumen yang mirip...

     Tidak ditemukan subyek yang mirip !

 10 dokumen yang berhubungan...






BANTU KAMI !
Anda bisa membantu kami untuk menentukan kata kunci yang tepat untuk dokumen ini dengan melakukan klik pada link dibawah :

BANGUN , INFORMASI , MANAJEMEN , PENJADUALAN , RANCANG , RANCANG BANGUN , SISTEM , SISTEM INFORMASI MANAJEMEN PENJADUALAN



.: Kembali ke daftar Undergraduate Theses

STIKOM DIGITAL LIBRARY

INSTITUTIONAL REPOSITORY


LOGIN AREA



[ REGISTRASI MEMBER ]





LINK

+ ADD TO BOOKMARK

+ DIGILIB INDONESIA





Hits : kali sejak 13 November 2008  • Alamat IP anda: 3.128.190.102

This Project is cooperation with ITS Library. Local Content & ReDesign © Juli 2008 STIKOM Library.                                                                     Top^
Dublin Core Metadata Initiative & OpenArchives Compatible | Best Viewed with 1024 x 768 resolution and Firefox!.