RANCANG BANGUN SISTEM INFORMASI PENJADWALAN PRODUKSI PAVING BLOCK PADA CV. EKO JOYO
DESIGN SYSTEM INFORMATION BLOCK SCHEDULING IN PRODUCTION PAVING CV. EKO JOYO
Undergraduate Theses dari STIKOM Surabaya / 21-06-2011 10:48:03 WIB
Posting oleh
nia • Ditampilkan sebanyak
76715 kali
Share this information :
Author : Agus Rudyanto (05410100165)
Subject | : | PRODUCTION PLANNING |
Keyword | : | Penjadwalan Produksi Earliest Due Date Maximum Tardiness Paired Comparisons Test. |
Abstract in
Bahasa IndonesiaSebagai home industry yang berkesempatan untuk meningkatkan layanan perusahaan, kinerja dan efisiensi sumber daya CV. Eko Joyo yang merupakan suatu perusahaan bergerak di bidang industri paving block selama ini melakukan penjadwalan produksi secara konvensional, sehingga sering terjadi keterlambatan dalam memenuhi target jatuh tempo penyelesaian produksi paving. Berdasarkan permasalahan tersebut perusahaan menginginkan perubahan yang signifikan terutama pada penjadwalan produksi agar keterlambatan dalam memenuhi target jatuh tempo yang sering terjadi dapat diminimalkan.
Metode Earliest Due Date (EDD) merupakan metode penjadwalan produksi yang menghasilkan maximum tardiness yang paling minimum. Metode ini mengurutkan pekerjaan-pekerjaan berdasarkan tanggal jatuh tempo (due date) yang terdekat. Untuk mengetahui seberapa jauh pengaruh penggunaan metode earliest due date terhadap penjadwalan produksi paving pada CV. Eko Joyo, dilakukan dengan menggunakan uji t-test.
Pengujian t-test membuktikan bahwa menggunakan metode konvensional maximum tardiness yang di dapat lebih besar dibandingkan menggunakan metode EDD. Jadi sistem informasi penjadwalan produksi dengan metode EDD dapat meminimalkan keterlambatan maksimum dan lebih baik dibandingkan dengan cara konvensional.
Abstract
As home industry that have opportunity to enhance company service, performance and efficiency resource Eko Joyo CV, which is a company that manufacturing block paving has been done in the conventional production scheduling, which often occur delay to finish due date production targets of block paving. Performance criteria used in this company how to minimize maximum delay (maximum tardiness).
Earliest Due Date (EDD) method scheduling that gives minimum of maximum tardiness. This method sorts jobs depend on nearest due date. To find how far application of production scheduling information system can minimize maximum tardiness, done using t-test.
From t-test proved using conventional method got maximum tardiness is higher than while using EDD method. So production scheduling information system using EDD method can minimize maximum tardiness and better than conventional method.
Contributor | : | Moh. Arifin, S.Pd., M.Si., MOS
|
Date Create | : | 21-06-2011 |
Type | : | Text |
Format | : | pdf |
Language | : | Indonesian |
Identifier | : | STIKOM Surabaya-Undergraduate-4-22826 |
Collection ID | : | 4-22826 |
Call Number | : | PERPUSTAKAAN 658.503 Rud R |
Coverage : Terbatas Sivitas Akademika STIKOM Surabaya
Rights : Hak Cipta (c) 2009 oleh STIKOM SURABAYA. Dilarang mengcopy atau mendistribusikan baik sebagian atau seluruh isi koleksi ini dalam bentuk apapun, baik secara elektronis maupun mekanis tanpa izin dari penulis.
Download koleksi - Terbatas untuk Member1. STIKOM Surabaya-Undergraduate-2068-COVER.pdf - 53 KB
2. STIKOM Surabaya-Undergraduate-2068-ABSTRAK.pdf - 93 KB
3. STIKOM Surabaya-Undergraduate-2068-DAFTAR ISI.pdf - 193 KB
4. STIKOM Surabaya-Undergraduate-2068-BAB I.pdf - 487 KB
5. STIKOM Surabaya-Undergraduate-2068-BAB II.pdf - 1143 KB
6. STIKOM Surabaya-Undergraduate-2068-BAB III.pdf - 2096 KB
7. STIKOM Surabaya-Undergraduate-2068-BAB IV.pdf - 2662 KB
8. STIKOM Surabaya-Undergraduate-2068-BAB V.pdf - 118 KB
9. STIKOM Surabaya-Undergraduate-2068-DAFTAR PUSTAKA.pdf - 75 KB
10. STIKOM Surabaya-Undergraduate-2068-MAKALAH.pdf - 1212 KB
10 dokumen yang mirip... 10 dokumen yang berhubungan... Tidak ditemukan subyek yang berhubungan !
.: Kembali ke daftar Undergraduate Theses